The different stages of the construction of an ipe hardwood deck on concrete footings

 

ipe deck design

First step; deck design - Building a wooden terrace

 

It is ultimately the wood we chose to keep architectural unity with our wooden house. We are very focused on building speeds so we chose for a terrace on concrete blocks which are fixed on a structure of beams.

 

Supporting joists that receives the floor (see STEPS PROJECT).

We put on paper, the plan of the terrace and ideas have enriched our thinking on our outdoor ipe decking design.

 

The constructive system, Starting with a plan in mind. To build a deck, several solutions exist for both elements structural finishes for the floor. Among the various possibilities (all concrete, stone, wood ... everything) we focused on a mixed construction system (for concrete foundation pads) which leaves a large wood (wood joists, wood blade).

 

The important thing was to limit the use of concrete blocks on the implementation of foundation as few as possible. For this we went on a support structure beam section large enough (197mm x 72mm joists of) to increase the span length by minimizing the number of blocks.

deck framing

deck levelling

 

the frame is fixed to the deck joists through iron shoes leaving 50 cm spacing between the beams of which come to fixing the decking by means of clips (to prevent the screws apparent).

 

Foundations from paper to the field. Once the plan is approved and the design must roll up their sleeves and to work. We must take action, locate the precise location of concrete blocks that will support the structure of the deck and mark the contours of the patio. For this we can help pickets (iron, wood ...) and string (or cord). This allows for a clearer picture on the rendering the paper deck size, or change the original plan a confrontation with reality spaces. The implementation is the first act concrete construction of the terrace and will determine the rest of the site.

 

Once the deck and concrete footings are put in place, we must measure approximately the height between the ground and the floor level for assembly of joists. Solid foundation, it is important

 

Once the concrete blocks were placed, they are leveled and have dried for at least 1 week, prepare the installation of the support structure joists. First, some beams were placed on concrete pads to show levels according to the lower part of the woodwork.

ipe decking installation

ipe lapacho deck

hardwood deck species

ipe wood stock

diy ipe decking

ipe specification data

decking designs

best deck prices

info@hardydeck.com

 

Solid Hardwood Flooring

- IPE hardwood flooring

- Massaranduba flooring

- Tigerwood flooring

- Bulletwood flooring

 

Massaranduba deck

- bulletwood deck

- massaranduba deck

- massaranduba compared

- massaranduba production

 

Decking compared

- cumaru deck

- garapa deck

- tigerwood

- curupay data

composite deck

- composite deck price

- maintenance

- eco friendliness

 

Legal hardwood

- certified ipe

- FLEG

- legal ipe hardwood

 

sawn lumber

deck glossary

railway sleepers

retaining walls

 

projects

real estate projects

photo galleries

- ipe hardwood deck

- tigerwood decking

- massaranduba deck

- hardwood flooring

- pooldecks

 

newsletter

deck videos

how to section

- deckstain

- ipe problems

- deck maintenance

- deck renovating

how to section

- installing deck

- deck renovating

- deck building

- storage and acclimating

 

Hardydeck The different stages of the construction of a wooden terrace on concrete footings

see for more on sitemap